Boston Energy to play a key role in the MHI Vestas pre-assembly contracts to be delivered at Vlissingen

Boston Energy are delighted to have been awarded a significant share of the MVOW pre-assembly contracts, based out of the European Assembly Hub of Vlissingen in the Netherlands.

Following two highly successful projects, supporting MVOW with pre-assembly teams on the Burbo Bank extension and Walney Three, Boston Energy have been entrusted to deliver a positive outcome at the Vlissingen site.  Boston Energy are both proud and committed in the shared project goals of safety and quality, and we join MHI Vestas fully in this enterprise.

Adrian Yeaman – Operations Manager at Boston Energy said “I am delighted MVOW have had the confidence in Boston Energy to award us with such a significant share of these new and prestigious contracts. We now look forward to delivering the scope of work with our usual ‘can do’ attitude and our engineering mentality – assuring our actions are safe, we deliver a quality of service and we link fully with MHI Vestas in promoting their zero harm culture. ”